The highway authorities would like to inform users of the Shah Alam Expressway of the pedestrian bridge launching works by Sunway Group which will involve traffic diversions over two weekends on 22 July 2023 and 29 July 2023 from 11:00 PM to 5:30 AM as follows.
For 22 July 2023, SAE users are advised to refer to the traffic diversion route as indicated in the Schematic Diagram below: –
Schematic Diagram for traffic diversion on 22 July 2023
The Travel Advisory for alternative routes on 22 July 2023 during the pedestrian bridge launching works by Sunway is as below:
For 29 July 2023, the traffic diversion route is as indicated in the Schematic Diagram below:
Schematic Diagram for traffic diversion on 29 July 2023
The Travel Advisory for alternative routes on 29 July 2023 is as follows:
The temporary traffic diversions on both 22 July 2023 and 29 July 2023 will also involve lane closure of the U-Turn before Sunway Toll Plaza and the motorcycle lane. SAE road users are advised to drive carefully and adhere to the road signages posted during the entire duration of the pedestrian bridge launching works.
Please contact our KESAS Hotline at 03-5633 7188 or Twitter @kesastrafik